choose your labelling

HAS AND/OR LABEL X ® à la carte

In a more punctual way, SG PROD MédiLAN accompanies you during projects bound(connected) to the HAS AND/OR LABEL X ®:

· Organized by a structure of management of the risk
· Organized by a structure of ratification
· Integration of the HAS and/or Label X ® to the projects, of the definition in the putting in production
· Led(Driven) by risk analysis 
· Assistance(Audience) in committee(commission) of ratification
· Support(Accompaniment) in the magazine(review) of the systems in exploitation(operation)

brought into conformity

Put in conformity HAS AND\OR LABEL X ®

The systems put in production between May 18th, 2010 and November 18th, 2010 must be put in conformity before May 18th, 2011. This service aims at putting in conformity the systems already ready:

· Definition of the objectives of safety · Analysis of the application and the statement of the gaps · Definition of an action plan of putting in conformity · Checks actions carried out · Support in the ratification of the system

LABEL X

Put into service HAS AND\OR LABEL X ®

· Definition of the objectives of safety

· Preparation of the file of safety

· Definition of the measures to implement

· Piloting safety of the project

· Audit of preliminary control

· Support in the ratification of the system